Inspection starts with the paperwork and ends with the parts. First the label: does the part number, quantity and date code on the box match what was ordered and what the invoice says. A mismatch here stops the lot before anything is opened.

Then the packaging. Original reels, trays or tubes, seals intact, no re-labelling. Parts that have been re-reeled are not automatically bad, but they need a reason and a record.

Then the parts themselves: markings compared against the datasheet, pin condition under magnification, and solderability on a sample where the lot is old. Moisture-sensitive parts get the humidity indicator checked and, where needed, a bake before shipment.

If any step raises a question we hold the lot and say why. A delayed shipment is a conversation; a bad lot that ships is a return, a line stop and a customer who does not come back.